Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Tank
5.3%
OF COST SPENT
₹39.20 L spent
of ₹7.38 Cr sanctioned
₹6.99 Cr still to spend
on 57 ongoing works
Works ongoing
57
Open the list of these works →
Sanctioned
₹7.38 Cr
Pure scheme (wage + material)
Expenditure since inception
₹39.20 L
5.3% of sanction
Balance cost (unspent)
₹6.99 Cr
Wage₹3.82 Cr
Material₹3.16 Cr
Trend · statewide

—
—
Slowest spending this FY · worth a look
Bhind — Bhind ₹39,528
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore