Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGFarm Pond
14.7%
OF COST SPENT
₹2.48 Cr spent
of ₹16.85 Cr sanctioned
₹14.37 Cr still to spend
on 542 ongoing works
Works ongoing
542
Open the list of these works →
Sanctioned
₹16.85 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.48 Cr
14.7% of sanction
Balance cost (unspent)
₹14.37 Cr
Wage₹11.30 Cr
Material₹3.08 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore