Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Trench
65.1%
OF COST SPENT
₹22.92 L spent
of ₹35.21 L sanctioned
₹12.29 L still to spend
on 11 ongoing works
Works ongoing
11
Open the list of these works →
Sanctioned
₹35.21 L
Pure scheme (wage + material)
Expenditure since inception
₹22.92 L
65.1% of sanction
Balance cost (unspent)
₹12.29 L
Wage₹7.71 L
Material₹4.59 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr