Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Road and Culvert
56%
OF COST SPENT
₹71.36 L spent
of ₹1.28 Cr sanctioned
₹56.14 L still to spend
on 6 ongoing works
Works ongoing
6
Open the list of these works →
Sanctioned
₹1.28 Cr
Pure scheme (wage + material)
Expenditure since inception
₹71.36 L
56% of sanction
Balance cost (unspent)
₹56.14 L
Wage₹9.28 L
Material₹46.86 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore