Ongoing works in MGNREGA + VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMG
14%
OF COST SPENT
₹5.70 L spent
of ₹40.84 L sanctioned
₹35.14 L still to spend
on 53 ongoing works
Works ongoing
53
Open the list of these works →
Sanctioned
₹40.84 L
Pure scheme (wage + material)
Expenditure since inception
₹5.70 L
14% of sanction
Balance cost (unspent)
₹35.14 L
Wage₹28.81 L
Material₹6.33 L
Trend

—
—
Slowest spending this FY · worth a look
Dhar — Tirla −₹8.26 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type