Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMG
2.4%
OF COST SPENT
₹1.38 L spent
of ₹57.97 L sanctioned
₹56.59 L still to spend
on 51 ongoing works
Works ongoing
51
Open the list of these works →
Sanctioned
₹57.97 L
Pure scheme (wage + material)
Expenditure since inception
₹1.38 L
2.4% of sanction
Balance cost (unspent)
₹56.59 L
Wage₹36.92 L
Material₹19.67 L
Trend

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By district

Amounts in ₹ Lakh