Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstr of GP Bhawan
67%
OF COST SPENT
₹61.23 L spent
of ₹91.37 L sanctioned
₹30.15 L still to spend
on 16 ongoing works
Works ongoing
16
Open the list of these works →
Sanctioned
₹91.37 L
Pure scheme (wage + material)
Expenditure since inception
₹61.23 L
67% of sanction
Balance cost (unspent)
₹30.15 L
Wage₹6.60 L
Material₹23.55 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh