Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Tank
66.6%
OF COST SPENT
₹28.16 Cr spent
of ₹42.30 Cr sanctioned
₹14.14 Cr still to spend
on 279 ongoing works
Works ongoing
279
Open the list of these works →
Sanctioned
₹42.30 Cr
Pure scheme (wage + material)
Expenditure since inception
₹28.16 Cr
66.6% of sanction
Balance cost (unspent)
₹14.14 Cr
Wage₹10.07 Cr
Material₹4.07 Cr
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown