Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of NADEP/Vermi Compost Pit
3.1%
OF COST SPENT
₹14,497 spent
of ₹4.71 L sanctioned
₹4.57 L still to spend
on 29 ongoing works
Works ongoing
29
Open the list of these works →
Sanctioned
₹4.71 L
Pure scheme (wage + material)
Expenditure since inception
₹14,497
3.1% of sanction
Balance cost (unspent)
₹4.57 L
Wage₹49,252
Material₹4.07 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Alirajpur — Jobat ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP