Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGFarm Pond
17.4%
OF COST SPENT
₹48.45 L spent
of ₹2.78 Cr sanctioned
₹2.30 Cr still to spend
on 118 ongoing works
Works ongoing
118
Open the list of these works →
Sanctioned
₹2.78 Cr
Pure scheme (wage + material)
Expenditure since inception
₹48.45 L
17.4% of sanction
Balance cost (unspent)
₹2.30 Cr
Wage₹1.69 Cr
Material₹60.76 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost