Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Trench
5.8%
OF COST SPENT
₹25.13 L spent
of ₹4.34 Cr sanctioned
₹4.09 Cr still to spend
on 74 ongoing works
Works ongoing
74
Open the list of these works →
Sanctioned
₹4.34 Cr
Pure scheme (wage + material)
Expenditure since inception
₹25.13 L
5.8% of sanction
Balance cost (unspent)
₹4.09 Cr
Wage₹3.33 Cr
Material₹75.20 L
Trend · statewide

—
—
Slowest spending this fortnight · worth a look
Sidhi — Sihawal −₹1.36 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore