Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
46.1%
OF COST SPENT
₹2.19 Cr spent
of ₹4.74 Cr sanctioned
₹2.55 Cr still to spend
on 24 ongoing works
Works ongoing
24
Open the list of these works →
Sanctioned
₹4.74 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.19 Cr
46.1% of sanction
Balance cost (unspent)
₹2.55 Cr
Wage₹69.08 L
Material₹1.86 Cr
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Crore