Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Well
117.1%
OF COST SPENT
₹6.68 L spent
of ₹5.70 L sanctioned
−₹97,736 still to spend
on 3 ongoing works
Works ongoing
3
Open the list of these works →
Sanctioned
₹5.70 L
Pure scheme (wage + material)
Expenditure since inception
₹6.68 L
117.1% of sanction
Balance cost (unspent)
−₹97,736
Wage₹42,112
Material−₹1.40 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Lakh