Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
5.4%
OF COST SPENT
₹75,867 spent
of ₹13.99 L sanctioned
₹13.24 L still to spend
on 5 ongoing works
Works ongoing
5
Open the list of these works →
Sanctioned
₹13.99 L
Pure scheme (wage + material)
Expenditure since inception
₹75,867
5.4% of sanction
Balance cost (unspent)
₹13.24 L
Wage₹4.06 L
Material₹9.17 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Lakh