Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGFarm Pond
18.6%
OF COST SPENT
₹36.74 L spent
of ₹1.98 Cr sanctioned
₹1.61 Cr still to spend
on 74 ongoing works
Works ongoing
74
Open the list of these works →
Sanctioned
₹1.98 Cr
Pure scheme (wage + material)
Expenditure since inception
₹36.74 L
18.6% of sanction
Balance cost (unspent)
₹1.61 Cr
Wage₹1.28 Cr
Material₹32.82 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh