Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstr of GP Bhawan
2.1%
OF COST SPENT
₹13.47 L spent
of ₹6.53 Cr sanctioned
₹6.40 Cr still to spend
on 181 ongoing works
Works ongoing
181
Open the list of these works →
Sanctioned
₹6.53 Cr
Pure scheme (wage + material)
Expenditure since inception
₹13.47 L
2.1% of sanction
Balance cost (unspent)
₹6.40 Cr
Wage₹3.04 Cr
Material₹3.36 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
NARMADAPURAM — HOSHANGABAD ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore