Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstr of Cement Concrete Roads
71%
OF COST SPENT
₹9.99 Cr spent
of ₹14.08 Cr sanctioned
₹4.09 Cr still to spend
on 259 ongoing works
Works ongoing
259
Open the list of these works →
Sanctioned
₹14.08 Cr
Pure scheme (wage + material)
Expenditure since inception
₹9.99 Cr
71% of sanction
Balance cost (unspent)
₹4.09 Cr
Wage₹3.60 Cr
Material₹48.36 L
Trend · statewide

—
—
Slowest spending this fortnight · worth a look
Sidhi — Sihawal −₹1.36 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore