Ongoing works in MGNREGA

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
39.8%
OF COST SPENT
₹3.45 Cr spent
of ₹8.65 Cr sanctioned
₹5.20 Cr still to spend
on 102 ongoing works
Works ongoing
102
Open the list of these works →
Sanctioned
₹8.65 Cr
Pure scheme (wage + material)
Expenditure since inception
₹3.45 Cr
39.8% of sanction
Balance cost (unspent)
₹5.20 Cr
Wage₹2.12 Cr
Material₹3.08 Cr
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore