Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Percolation Tank
20.3%
OF COST SPENT
₹29.49 L spent
of ₹1.45 Cr sanctioned
₹1.16 Cr still to spend
on 43 ongoing works
Works ongoing
43
Open the list of these works →
Sanctioned
₹1.45 Cr
Pure scheme (wage + material)
Expenditure since inception
₹29.49 L
20.3% of sanction
Balance cost (unspent)
₹1.16 Cr
Wage₹92.42 L
Material₹23.15 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore