Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Tank
71.6%
OF COST SPENT
₹3.01 Cr spent
of ₹4.21 Cr sanctioned
₹1.19 Cr still to spend
on 28 ongoing works
Works ongoing
28
Open the list of these works →
Sanctioned
₹4.21 Cr
Pure scheme (wage + material)
Expenditure since inception
₹3.01 Cr
71.6% of sanction
Balance cost (unspent)
₹1.19 Cr
Wage₹79.55 L
Material₹39.72 L
Trend · statewide

—
—
Slowest spending this fortnight · worth a look
Sidhi — Sihawal −₹1.36 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh