Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAFarm Pond
20.5%
OF COST SPENT
₹1.84 Cr spent
of ₹8.97 Cr sanctioned
₹7.13 Cr still to spend
on 311 ongoing works
Works ongoing
311
Open the list of these works →
Sanctioned
₹8.97 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.84 Cr
20.5% of sanction
Balance cost (unspent)
₹7.13 Cr
Wage₹5.79 Cr
Material₹1.34 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore