Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Well
50.2%
OF COST SPENT
₹11.75 Cr spent
of ₹23.41 Cr sanctioned
₹11.66 Cr still to spend
on 544 ongoing works
Works ongoing
544
Open the list of these works →
Sanctioned
₹23.41 Cr
Pure scheme (wage + material)
Expenditure since inception
₹11.75 Cr
50.2% of sanction
Balance cost (unspent)
₹11.66 Cr
Wage₹3.48 Cr
Material₹8.18 Cr
Trend · statewide

—
—
Slowest spending this FY · worth a look
Dhar — Tirla −₹8.26 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore