MGNREGAConstruction of Check Dam/Stop Dam
28.1%
OF COST SPENT
₹19.28 L spent
of ₹68.65 L sanctioned
₹49.37 L still to spend
on 15 ongoing works
Works ongoing
15
Open the list of these works →
Sanctioned
₹68.65 L
Pure scheme (wage + material)
Expenditure since inception
₹19.28 L
28.1% of sanction
Balance cost (unspent)
₹49.37 L
Wage₹27.33 L
Material₹22.04 L