Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstr of Cement Concrete Roads
2.8%
OF COST SPENT
₹83,400 spent
of ₹29.98 L sanctioned
₹29.15 L still to spend
on 45 ongoing works
Works ongoing
45
Open the list of these works →
Sanctioned
₹29.98 L
Pure scheme (wage + material)
Expenditure since inception
₹83,400
2.8% of sanction
Balance cost (unspent)
₹29.15 L
Wage₹29.15 L
Material₹0
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh