Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Road and Culvert
1.2%
OF COST SPENT
₹2.40 L spent
of ₹1.94 Cr sanctioned
₹1.92 Cr still to spend
on 16 ongoing works
Works ongoing
16
Open the list of these works →
Sanctioned
₹1.94 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.40 L
1.2% of sanction
Balance cost (unspent)
₹1.92 Cr
Wage₹67.60 L
Material₹1.24 Cr
Trend · statewide

—
—
Slowest spending this FY · worth a look
BHIND — BHIND ₹43,128
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh