Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
5.8%
OF COST SPENT
₹2.29 L spent
of ₹39.51 L sanctioned
₹37.21 L still to spend
on 8 ongoing works
Works ongoing
8
Open the list of these works →
Sanctioned
₹39.51 L
Pure scheme (wage + material)
Expenditure since inception
₹2.29 L
5.8% of sanction
Balance cost (unspent)
₹37.21 L
Wage₹26.51 L
Material₹10.70 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh