Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGFarm Pond
0.8%
OF COST SPENT
₹1.46 L spent
of ₹1.71 Cr sanctioned
₹1.70 Cr still to spend
on 96 ongoing works
Works ongoing
96
Open the list of these works →
Sanctioned
₹1.71 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.46 L
0.8% of sanction
Balance cost (unspent)
₹1.70 Cr
Wage₹1.34 Cr
Material₹35.48 L
Trend · statewide

—
—
Slowest spending this FY · worth a look
BHIND — BHIND ₹43,128
Top 10 new work types

Ranked by sanctioned cost