Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Check Dam/Stop Dam
1.2%
OF COST SPENT
₹1.21 L spent
of ₹1.00 Cr sanctioned
₹99.17 L still to spend
on 23 ongoing works
Works ongoing
23
Open the list of these works →
Sanctioned
₹1.00 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.21 L
1.2% of sanction
Balance cost (unspent)
₹99.17 L
Wage₹50.20 L
Material₹48.97 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Narmadapuram — Hoshangabad ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh