Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Tank
43.7%
OF COST SPENT
₹7.88 Cr spent
of ₹18.06 Cr sanctioned
₹10.17 Cr still to spend
on 161 ongoing works
Works ongoing
161
Open the list of these works →
Sanctioned
₹18.06 Cr
Pure scheme (wage + material)
Expenditure since inception
₹7.88 Cr
43.7% of sanction
Balance cost (unspent)
₹10.17 Cr
Wage₹6.41 Cr
Material₹3.77 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore