Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Percolation Tank
31.2%
OF COST SPENT
₹1.86 Cr spent
of ₹5.95 Cr sanctioned
₹4.09 Cr still to spend
on 195 ongoing works
Works ongoing
195
Open the list of these works →
Sanctioned
₹5.95 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.86 Cr
31.2% of sanction
Balance cost (unspent)
₹4.09 Cr
Wage₹2.88 Cr
Material₹1.21 Cr
Trend · statewide

—
—
Slowest spending this FY · worth a look
Dhar — Tirla −₹8.26 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore