Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Road and Culvert
46.1%
OF COST SPENT
₹5.24 Cr spent
of ₹11.36 Cr sanctioned
₹6.12 Cr still to spend
on 70 ongoing works
Works ongoing
70
Open the list of these works →
Sanctioned
₹11.36 Cr
Pure scheme (wage + material)
Expenditure since inception
₹5.24 Cr
46.1% of sanction
Balance cost (unspent)
₹6.12 Cr
Wage₹2.63 Cr
Material₹3.48 Cr
Trend · statewide

—
—
Slowest spending this fortnight · worth a look
Sidhi — Sihawal −₹1.36 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore