Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstr of Cement Concrete Roads
60.9%
OF COST SPENT
₹2.23 Cr spent
of ₹3.66 Cr sanctioned
₹1.43 Cr still to spend
on 382 ongoing works
Works ongoing
382
Open the list of these works →
Sanctioned
₹3.66 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.23 Cr
60.9% of sanction
Balance cost (unspent)
₹1.43 Cr
Wage₹1.14 Cr
Material₹29.05 L
Trend · statewide

—
—
Slowest spending this fortnight · worth a look
Sidhi — Sihawal −₹1.36 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore