Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Trench
43.9%
OF COST SPENT
₹2.07 Cr spent
of ₹4.72 Cr sanctioned
₹2.64 Cr still to spend
on 47 ongoing works
Works ongoing
47
Open the list of these works →
Sanctioned
₹4.72 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.07 Cr
43.9% of sanction
Balance cost (unspent)
₹2.64 Cr
Wage₹1.82 Cr
Material₹82.66 L
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost