Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of NADEP/Vermi Compost Pit
36.3%
OF COST SPENT
₹18.99 L spent
of ₹52.36 L sanctioned
₹33.36 L still to spend
on 62 ongoing works
Works ongoing
62
Open the list of these works →
Sanctioned
₹52.36 L
Pure scheme (wage + material)
Expenditure since inception
₹18.99 L
36.3% of sanction
Balance cost (unspent)
₹33.36 L
Wage₹5.36 L
Material₹28.00 L
Trend · statewide

—
—
Slowest spending this FY · worth a look
Dhar — Tirla −₹8.26 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh