Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Well
59.6%
OF COST SPENT
₹38.63 L spent
of ₹64.83 L sanctioned
₹26.20 L still to spend
on 22 ongoing works
Works ongoing
22
Open the list of these works →
Sanctioned
₹64.83 L
Pure scheme (wage + material)
Expenditure since inception
₹38.63 L
59.6% of sanction
Balance cost (unspent)
₹26.20 L
Wage₹4.78 L
Material₹21.42 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Lakh