Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
36.4%
OF COST SPENT
₹3.00 Cr spent
of ₹8.26 Cr sanctioned
₹5.25 Cr still to spend
on 108 ongoing works
Works ongoing
108
Open the list of these works →
Sanctioned
₹8.26 Cr
Pure scheme (wage + material)
Expenditure since inception
₹3.00 Cr
36.4% of sanction
Balance cost (unspent)
₹5.25 Cr
Wage₹2.19 Cr
Material₹3.06 Cr
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost