Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Check Dam/Stop Dam
3.2%
OF COST SPENT
₹8.92 L spent
of ₹2.80 Cr sanctioned
₹2.71 Cr still to spend
on 47 ongoing works
Works ongoing
47
Open the list of these works →
Sanctioned
₹2.80 Cr
Pure scheme (wage + material)
Expenditure since inception
₹8.92 L
3.2% of sanction
Balance cost (unspent)
₹2.71 Cr
Wage₹1.32 Cr
Material₹1.39 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore