Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Trench
32.4%
OF COST SPENT
₹4.74 Cr spent
of ₹14.63 Cr sanctioned
₹9.90 Cr still to spend
on 443 ongoing works
Works ongoing
443
Open the list of these works →
Sanctioned
₹14.63 Cr
Pure scheme (wage + material)
Expenditure since inception
₹4.74 Cr
32.4% of sanction
Balance cost (unspent)
₹9.90 Cr
Wage₹7.83 Cr
Material₹2.06 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
NARMADAPURAM — HOSHANGABAD ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore