Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Road and Culvert
2.7%
OF COST SPENT
₹9.48 L spent
of ₹3.47 Cr sanctioned
₹3.38 Cr still to spend
on 23 ongoing works
Works ongoing
23
Open the list of these works →
Sanctioned
₹3.47 Cr
Pure scheme (wage + material)
Expenditure since inception
₹9.48 L
2.7% of sanction
Balance cost (unspent)
₹3.38 Cr
Wage₹2.21 Cr
Material₹1.16 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh