Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Tank
45.7%
OF COST SPENT
₹8.00 Cr spent
of ₹17.49 Cr sanctioned
₹9.49 Cr still to spend
on 164 ongoing works
Works ongoing
164
Open the list of these works →
Sanctioned
₹17.49 Cr
Pure scheme (wage + material)
Expenditure since inception
₹8.00 Cr
45.7% of sanction
Balance cost (unspent)
₹9.49 Cr
Wage₹6.14 Cr
Material₹3.35 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore