Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Check Dam/Stop Dam
3.4%
OF COST SPENT
₹3.22 L spent
of ₹94.45 L sanctioned
₹91.23 L still to spend
on 24 ongoing works
Works ongoing
24
Open the list of these works →
Sanctioned
₹94.45 L
Pure scheme (wage + material)
Expenditure since inception
₹3.22 L
3.4% of sanction
Balance cost (unspent)
₹91.23 L
Wage₹51.21 L
Material₹40.02 L
Trend · statewide

—
—
Slowest spending this week · worth a look
NARMADAPURAM — HOSHANGABAD ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh