Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Trench
6.5%
OF COST SPENT
₹8.29 L spent
of ₹1.28 Cr sanctioned
₹1.20 Cr still to spend
on 24 ongoing works
Works ongoing
24
Open the list of these works →
Sanctioned
₹1.28 Cr
Pure scheme (wage + material)
Expenditure since inception
₹8.29 L
6.5% of sanction
Balance cost (unspent)
₹1.20 Cr
Wage₹83.04 L
Material₹36.98 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh