Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Trench
15.8%
OF COST SPENT
₹55.50 L spent
of ₹3.52 Cr sanctioned
₹2.96 Cr still to spend
on 77 ongoing works
Works ongoing
77
Open the list of these works →
Sanctioned
₹3.52 Cr
Pure scheme (wage + material)
Expenditure since inception
₹55.50 L
15.8% of sanction
Balance cost (unspent)
₹2.96 Cr
Wage₹2.37 Cr
Material₹59.40 L
Trend · statewide

—
—
Slowest spending this month · worth a look
Indore — Mhow −₹30.65 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore