Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGFarm Pond
2.2%
OF COST SPENT
₹1.62 L spent
of ₹74.67 L sanctioned
₹73.06 L still to spend
on 41 ongoing works
Works ongoing
41
Open the list of these works →
Sanctioned
₹74.67 L
Pure scheme (wage + material)
Expenditure since inception
₹1.62 L
2.2% of sanction
Balance cost (unspent)
₹73.06 L
Wage₹58.13 L
Material₹14.93 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh