Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of NADEP/Vermi Compost Pit
40.1%
OF COST SPENT
₹43.28 L spent
of ₹1.08 Cr sanctioned
₹64.64 L still to spend
on 108 ongoing works
Works ongoing
108
Open the list of these works →
Sanctioned
₹1.08 Cr
Pure scheme (wage + material)
Expenditure since inception
₹43.28 L
40.1% of sanction
Balance cost (unspent)
₹64.64 L
Wage₹5.32 L
Material₹59.32 L
Trend · statewide

—
—
Slowest spending this month · worth a look
BURHANPUR — KHAKNAR ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh