Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Trench
65.3%
OF COST SPENT
₹1.64 Cr spent
of ₹2.51 Cr sanctioned
₹87.17 L still to spend
on 87 ongoing works
Works ongoing
87
Open the list of these works →
Sanctioned
₹2.51 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.64 Cr
65.3% of sanction
Balance cost (unspent)
₹87.17 L
Wage₹55.90 L
Material₹31.27 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Alirajpur — Jobat ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh