Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGPoultry Shelter
60.7%
OF COST SPENT
₹6.01 Cr spent
of ₹9.89 Cr sanctioned
₹3.89 Cr still to spend
on 511 ongoing works
Works ongoing
511
Open the list of these works →
Sanctioned
₹9.89 Cr
Pure scheme (wage + material)
Expenditure since inception
₹6.01 Cr
60.7% of sanction
Balance cost (unspent)
₹3.89 Cr
Wage₹59.20 L
Material₹3.29 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By district

Amounts in ₹ Crore