Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Road and Culvert
2.1%
OF COST SPENT
₹9.26 L spent
of ₹4.40 Cr sanctioned
₹4.30 Cr still to spend
on 40 ongoing works
Works ongoing
40
Open the list of these works →
Sanctioned
₹4.40 Cr
Pure scheme (wage + material)
Expenditure since inception
₹9.26 L
2.1% of sanction
Balance cost (unspent)
₹4.30 Cr
Wage₹2.06 Cr
Material₹2.25 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore