MGNREGA + VBGRAMGConstruction of Recharge Pits
33.8%
OF COST SPENT
₹33.58 L spent
of ₹99.47 L sanctioned
₹65.88 L still to spend
on 60 ongoing works
Works ongoing
60
Open the list of these works →
Sanctioned
₹99.47 L
Pure scheme (wage + material)
Expenditure since inception
₹33.58 L
33.8% of sanction
Balance cost (unspent)
₹65.88 L
Wage₹41.30 L
Material₹24.58 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh