Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of NADEP/Vermi Compost Pit
22.8%
OF COST SPENT
₹5.07 L spent
of ₹22.29 L sanctioned
₹17.22 L still to spend
on 81 ongoing works
Works ongoing
81
Open the list of these works →
Sanctioned
₹22.29 L
Pure scheme (wage + material)
Expenditure since inception
₹5.07 L
22.8% of sanction
Balance cost (unspent)
₹17.22 L
Wage₹5.07 L
Material₹12.15 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost